Shower

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9718068
SERIAL NO

14843692

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A shower assembly includes an inlet, a reservoir, a plurality of first outlets, and a plurality of second outlets. The inlet is for receiving water from a water source, and is configured to restrict water flow from the water source to a maximum inlet flow rate. The reservoir receives from the inlet. The plurality of first outlets are configured to pass water from the reservoir. The plurality of second outlets are configured to selectively pass water from the reservoir. The shower assembly is configured for a user to selectively control whether water passes through the plurality of second outlets. A sum of a first collective flow rate of the plurality of first outlets and a second collective flow rate of the plurality of second outlets is greater than the maximum inlet flow rate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KOHLER CO.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Elsesser, Jeffrey James Marshall, US 12 32
Giefer, James S Sheboygan, US 34 226
Rexach, Rafael Alfredo Sheboygan, US 27 267
Richter-O'Connell, David J Sheboygan, US 13 218
Szemetylo, Stephanie Sheboygan, US 20 55

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00