Modulated power burner system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9719683
SERIAL NO

12869291

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power burner system for use with a heating appliance includes a burner tube, a gas valve for providing gas to the burner tube, and a variable speed combustion air blower for mixing air with the gas provided to the burner tube. The burner system further includes a control in communication with the gas valve and the combustion air blower. The control may also be in communication with various other devices of an appliance, such as a variable speed air-circulating fan, a variable speed exhaust fan, or various sensors associated with the heating appliance. The control modulates the gas valve and the combustion air blower to maintain substantially stoichiometric conditions of the gas and air provided to the burner tube and as a function of signals from at least one of the devices. In one embodiment, the burner system may be used in a conveyor oven.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WAYNE/SCOTT FETZER COMPANYFORT WAYNE IN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cox, Donald W Fort Wayne, US 10 91
Noman, Syed Mohammad Shiblee Fort Wayne, US 3 77

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00