Turbulated immersion heat-exchange apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9719728
APP PUB NO 20130264028A1
SERIAL NO

13910934

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A submersible heat-exchanging apparatus for installation into storage tanks used for containing industrial oils. The apparatus comprises a cylindrical heat-exchange component with one end sealingly engaging a terminal plug and the other end sealingly engaging and communicating with a coupling manifold having opposed inflow and outflow ports. A flow-directing elongate insert is provided with one end configured to engage the coupling manifold interposed the inflow and outflow ports, and the other end provided with an aperture and configured for abutting the terminal plug. The flow-directing elongate insert slidingly contacts and cooperates with the inner walls of the heat-conductive conduit thereby partitioning the heat-conductive conduit into two opposed fluid transmission channels wherein one channel communicates with the inlet port and the other channel communicates with the outlet port. The coupling manifold sealingly engages an aperture provided in the storage tank whereby the heat-exchange component extends into the tank.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ARNOT ROGERABBOTSFORD

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arnot, Roger Abbotsford, CA 7 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00