Systems and method for processing optical cable assemblies

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9720185
APP PUB NO 20150338582A1
SERIAL NO

14718850

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A processing system to connectorize optical cables includes processing stations on a table arrangement; and a track arrangement. The processing stations include: a strip-clean-cleave station that creates prepared ends of cable fibers and stub fibers; a splice station that fusion splices the prepared ends of cable and stub fibers; an overmold station that injection molds hubs around the splices; a UV cure station and a heat cure station for the injection molding; and a connector assembly station at which an optical connector is assembled at an end of each optical cable.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BISON PATENT LICENSING LLC5282 FOREST SPRINGS DRIVE ATLANTA GA 30338

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Blaser, Joseph Shakopee, US 2 16
Carlson, Scott Bloomington, US 31 290
Carrillo, Velarde Francisco Gerardo El Paso, US 1 16
Halls, Joel Faribault, US 1 16
Lu, Yu Eden Prairie, US 368 9572
Narum, Mark D Minnetonka, US 9 40
Ott, Michael James Hudson, US 98 1748
Strahl, Todd Curtis Lakeville, US 1 16
Vozdecky, Jan Brno, CZ 5 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00