Subsea production system with multiple location master control station system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9720421
APP PUB NO 20140367113A1
SERIAL NO

14352298

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A subsea production system for producing fluids from a subsea well in a subsea field. The production system includes a production facility and a production umbilical connecting the subsea well with the production facility. The production system also includes a control system for controlling production from the subsea well. The control system includes a first redundant master control station system (redundant MCS) at a first location, the redundant MCS capable of controlling production from the subsea well. The control system also includes a second redundant MCS at a second location, the second redundant MCS capable of controlling production from the subsea well. The redundant MCSs are synchronized to keep the same electronic data at both locations and to prevent conflicts in control signals from the redundant MCSs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CAMERON INTERNATIONAL CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kleine, Ulrich Langenhagen, DE 13 64
Seeck, Roger Nienburg, DE 1 3
Wiegert, Björn Bröckel, DE 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00