Processing system with interspersed processors with multi-layer interconnection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9720867
APP PUB NO 20160335218A1
SERIAL NO

15219095

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of a multi-processor array are disclosed that may include a plurality of processors and configurable communication elements coupled together in a interspersed arrangement. Each configurable communication element may include a local memory and a plurality of routing engines. The local memory may be coupled to a subset of the plurality of processors. Each routing engine may be configured to receive one or more messages from a plurality of sources, assign each received message to a given destination of a plurality of destinations dependent upon configuration information, and forward each message to assigned destination. The plurality of destinations may include the local memory, and routing engines included in a subset of the plurality of configurable communication elements.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • COHERENT LOGIX, INCORPORATED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dobbs, Carl S Austin, US 43 556
Solka, Michael B Austin, US 28 405
Trocino, Michael R Austin, US 35 321

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00