Wire harness

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9721698
APP PUB NO 20170110217A1
SERIAL NO

15274125

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A first electric wire is fastened, in a first frame, by a plurality of first wire hooking ribs provided on upper side edges of an upper thin plate, and by a plurality of second wire hooking ribs provided at lower thin plates, thereby being routed three-dimensionally. A second electric wire is fastened, in a second frame, by a plurality of third wire hooking ribs provided staggered along the upper side edges of the second frame, thereby being routed in a serpentine shape. With the electric wires routed and the second frame accommodated at a predetermined location in a housing space of the first frame, the first electric wire passes below the second electric wire at openings in the structure and passes above the second electric wire at connecting portions in the structure while passing on the connecting portions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO WIRING SYSTEMS LTD1-14 NISHISUEHIROCHO YOKKAICHI-SHI MIE 5108503

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Oikawa, Seiji Mie, JP 8 55
Wakabayashi, Masataka Mie, JP 30 87

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00