Method of preparing inorganic particles and inorganic particles prepared using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9722246
APP PUB NO 20150318548A1
SERIAL NO

14440202

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a method of preparing inorganic particles using a hydrothermal synthesis device, including introducing a precursor liquid or slurry stream including a reaction precursor for preparation of an inorganic material into a hydrothermal synthesis reactor, introducing a supercritical liquid stream including water into the hydrothermal synthesis reactor, preparing an inorganic slurry by hydrothermal reaction in the hydrothermal synthesis reactor and discharging the inorganic slurry therefrom, and filtering the discharged inorganic slurry, wherein the precursor liquid or slurry stream includes an NH3 source at a high temperature of the supercritical liquid stream and thus clogging of the stream in the hydrothermal synthesis reactor is inhibited by pH changes in the hydrothermal reaction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LG CHEM, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jo, Chi Ho Daejeon, KR 65 138
Jung, Wang Mo Daejeon, KR 191 485
Noh, Hyun Kuk Daejeon, KR 10 49
Oh, Sang Seung Daejeon, KR 26 66
Park, Hong Kyu Daejeon, KR 91 1015
Ryu, Ji Hoon Daejeon, KR 46 178

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00