Carbon micro-plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9724667
SERIAL NO

14599089

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides biorefining systems for co-producing activated carbon along with primary products. A host plant converts a feedstock comprising biomass into primary products and carbon-containing co-products; a modular reactor system pyrolyzes and activates the co-products, to generate activated carbon and pyrolysis off-gas; and an oxidation unit oxidizes the pyrolysis off-gas, generating CO2, H2O, and energy. The energy is recycled and utilized in the host plant, and the CO2 and H2O may be recycled to the reactor system as an activation agent. The host plant may be a saw mill, a pulp and paper plant, a corn wet or dry mill, a sugar production facility, or a food or beverage plant, for example. In some embodiments, the activated carbon is utilized at the host plant to purify one or more primary products, to purify water, to treat a liquid waste stream, and/or to treat a vapor waste stream.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CARBON TECHNOLOGY HOLDINGS, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Despen, Daniel J Minneapolis, US 59 687
Mennell, James A Dellwood, US 105 1039
Reamer, David Minneapolis, US 11 164

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00