Composite of metal and resin and method for manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9724898
APP PUB NO 20140186641A1
SERIAL NO

14197439

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A magnesium alloy part is inserted into a mold, a resin composition is injected and joined to the part, and a composite is obtained. A part having, formed thereon, a surface layer of a metal oxide, a metal carbonate, or a metal phosphate in use of a usual conversion treatment or a modification method thereof can be used for the magnesium alloy plate 1. The surface that has a larger amount of crystal-like objects of a nanolevel on the surface layer composed of the metal oxide, metal carbonate, or metal phosphate has a higher level of hardness, microscopic roughness, and good injection joining force, and these parameters can be controlled by a conversion treatment method. A resin composition 4, containing PBT or PPS as the main component, is used as the resin composition part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAISEI PLAS CO LTDTOKYO 103-0007

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Andoh, Naoki Tokyo, JP 41 234
Naritomi, Masanori Tokyo, JP 50 682
Yamano, Naoki Yokkaichi, JP 38 148

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00