Method for reducing energy consumption in a process to produce styrene via dehydrogenation of ethylbenzene

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9725379
APP PUB NO 20150210613A1
SERIAL NO

14424184

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention is directed to improved methods and systems for increasing the efficiency of a dehydrogenation section of an alkenyl aromatic hydrocarbon production facility, wherein an alkyl aromatic hydrocarbon, such as ethylbenzene, is dehydrogenated to produce an alkenyl aromatic hydrocarbon, such as styrene. The disclosed methods are more energy-efficient and cost effective than currently known methods for manufacturing styrene. The methods and systems advantageously utilize multiple reheat exchangers arranged in a series and/or parallel configuration that result in an energy consumption reduction and, consequently, a utility cost savings, as well as a reduction in styrene manufacturing plant investment costs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TECHNIP PROCESS TECHNOLOGY INC1430 ENCLAVE PARKWAY HOUSTON TX 77077-2023

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Oleksy, Slawomir A Billerica, US 13 45

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00