Hydraulic control assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9726203
SERIAL NO

14538122

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydraulic control assembly for a plurality of consumers includes, for each consumer, a supply metering orifice configured to control fluid flow. A flow-sensing fluid-flow-path extends over detection orifices positioned hydraulically in series, whereby a detection orifice is assigned to each supply metering orifice. The fluid-flow-path is connected to a hydraulic pump upstream of the detection orifices, and a control device of the hydraulic pump downstream of the detection orifices. Each detection orifice is configured to close the fluid-flow-path upon detecting a fluid supply deficiency for a corresponding consumer, whereby the control device is configured to interact with the fluid-flow-path such that fluid flow from the hydraulic pump is increased. When no customers have a supply deficiency, the fluid-flow-path over the detection orifices is fully opened, and the control device is configured to reduce fluid flow from the hydraulic pump.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ROBERT BOSCH GMBH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Knapper, Steffen Vaihingen/Enz, DE 12 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00