Single-pole, single current path switching system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9726726
SERIAL NO

14832861

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

One embodiment describes a three-phase electromechanical switching device, which includes three single-phase switching devices mechanically and electrically coupled in parallel with one another, each single-phase switching device including a direct current electromagnetic operator that in operation receives a direct current control signal for switching of the device, stationary contacts disposed in a respective device housing, and a movable assembly that in operation is displaced by energizing the operator and that include movable contacts that open and close, with the stationary contacts, a single current carrying path through the respective single-phase switching device; in which each of the single-phase switching devices receives control signals from control circuitry coupled to the operators of the respective single-phase switching devices to cause at least one of the single-phase switching devices to open or close the single current carrying path at a desired time coordinated with a current zero-crossing or a predicted current zero-crossing of a phase of three-phase power.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ROCKWELL AUTOMATION TECHNOLOGIES, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bock, Christopher H Milwaukee, US 19 169
Dziekonski, Stefan T Greendale, US 21 167
Kinsella, James J Brentwood, US 33 384
Wieloch, Christopher J Brookfield, US 71 1159

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00