Method for evaluating operational and financial performance for dispatchers using after the fact analysis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9727828
SERIAL NO

12830004

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is provided for evaluating operational and financial performance for dispatchers in power grid control centers associated with utility systems. A comprehensive operating plan is provided that applies after the fact analysis for performance metrics, root-cause impacts and process re-engineering. after the fact analysis of past events and practices is performed. Actual system and resource conditions are captured. the system and resource conditions are supplied to a relational database. A scheduler engine receives the actual system and resource conditions from the relational database and processes it to calculate system performance. At least one of the following is displayed, transmission evaluation application displays, reference and scenario cases and associations between them, results presented with a graphical or tabular displays, comparison results between scenario cases and a reference case, a family of curves where each curve is a performance metric, comparison of scenario input data, study results and statistical analysis and historical data.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ALSTOM TECHNOLOGY LTD;AREVA T & D

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheung, Kwok Redmond, US 17 275
Chiu, But-Chung Bellevue, US 8 89
Mok, Kee Clyde Hill, US 3 34
Sun, David Kirkland, US 66 1302
Wang, Xing Redmond, US 197 1022
Xiao, Ying Redmond, US 58 618
Yao, Mike Sammamish, US 3 34

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00