Drum-type tri-phase transformer and methods for producing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9728318
SERIAL NO

14406327

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This new type of transformer comprises a ferromagnetic drum-type core characterized in that the drum core has a plurality of holes or windows parallel to the drum longitudinal shaft to place the windings being the windows arranged close to the periphery of the drum symmetrically distributed at 360° of the circumference, each winding being parallel to the longitudinal shaft of the drum and each one of the windings crossing said longitudinal shaft. The core comprises two main components: a central body and an air gap filling system. The central body is formed by a plurality of silicon steel sheets, stacked one over the other, each of them has slots or spaces on its periphery thereof to place the windings and with an air gap filling system. Said filling system can be: wedge-shaped sheets, set of sheets extending parallel to the shaft of the core or a metal sheet wound around the central body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PONTIFICIA UNIVERSIDAD CATOLICA DEL PERUPERU LIMA LIMA LIMA REGION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ismodes, Cascon Anibal Eduardo Lima, PE 1 1
Melgarejo, Ponte Oscar Antonio Lima, PE 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00