Piezoelectric vibration component having distinguishable opposing principal surfaces

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9729124
SERIAL NO

14670251

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A piezoelectric vibration component that includes a sealed space formed between first and second package members, and a piezoelectric vibrator is bonded to the first package member with first and second conductive adhesive portions. In the piezoelectric vibrator, a first vibration electrode and a first extended electrode are formed on a first surface of a piezoelectric substrate, and a second vibration electrode and a second extended electrode are formed on a second surface of the piezoelectric substrate. At least the second extended electrode provided on the second principal surface has a higher bonding strength with respect to the conductive adhesive than that of the electrodes on the first principal surface. The electrode patterns on the first and second principal surfaces differ from each other so that the first surface and the second surface can be distinguished from each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MURATA MANUFACTURING CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Oishibashi, Hidekazu Nagaokakyo, JP 4 9
Okamoto, Bunta Nagaokakyo, JP 11 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00