Biochemical reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9731296
SERIAL NO

14577655

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A biochemical reactor includes a temperature control device containing a substrate, a first conductive layer, a second conductive layer, a receiving hole, and a heating element. The substrate has a through hole for accommodating the vessel; the receiving hole is adjacent to the through hole for receiving the heating element; the first conductive layer has a connecting region formed on the wall of the through hole; and two terminals of the heating element are respectively connected electrically to the first and the second conductive layers. As such, the heat generated from the heating element can be transferred to the through hole via the first conductive layer to heat the vessel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENEREACH BIOTECHNOLOGY CORPNO 19 KEYUAN 2ND RD CENTRAL TAIWAN SCIENCE PARK TAICHUNG 407

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Hsiao-Fen Taichung, TW 6 8
Cheng, Wen-Hao Taichung, TW 102 272
Li, Pei-Yu Taichung, TW 8 18
Lin, Ching-Ko Taichung, TW 8 29
Su, Chen Taichung, TW 57 296
Tsai, Yun-Lung Taichung, TW 8 78

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00