System for continuously producing hydrogen, heat and aluminum oxides on demand

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9731967
SERIAL NO

15382418

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for producing hydrogen gas, heat and an oxide component using a water splitting process is disclosed. The system involves a dry first chamber containing a passivating-oxide preventing reagent that receives a solid material feedstock and dissolves the solid material feedstock in the passivating-oxide preventing reagent. The passivating-oxide preventing reagent becomes saturated with the solid material in the first chamber and is then transferred to a second chamber without contact with water. In the second chamber, the solid material saturated in the passivating-oxide preventing reagent reacts with the water so as to generate hydrogen gas, an oxide component and heat. Following the reaction, the solid material depleted passivating-oxide preventing reagent and water is recycled to be re-used in the water splitting process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
B&B GULF LLC102 WET FEET COURT PORT ST JOE FL 32456

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rowley, Thomas E San Jose, US 9 96
Woodall, Jerry M Davis, US 75 1511

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00