Gripper for a drill string component handling device, method for manoeuvring a gripper, drill string component device and rock drill rig

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9732568
APP PUB NO 20150330163A1
SERIAL NO

14651493

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gripping device for a drill string component handling device in a rock drill rig. Gripper element pairs are supported by a body and include at least one gripper element, being pivotally movable around a pivot joint, between a closed position, including a gripping position, and an open position. The pivotally movable gripper element is pivotal in a respective gripper plane forming a right angle to an axial direction. Each movable gripper element includes an actuation portion, which co-operates with a wedge device being movable in directions parallel to the axial direction for pivoting said movable gripper element. A method, a drill string component handling device for a rock drill rig and a rock drill rig including a drill string component handling device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EPIROC ROCK DRILLS AKTIEBOLAG701 91 ÖREBRO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lindberg, Johan Saltsjö-boo, SE 39 51

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00