Method and system for aligning a point of aim with a point of impact for a projectile device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9733047
SERIAL NO

15192620

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and systems for aligning a point of aim with a point of impact for a projectile device are disclosed. Using a superposition device coupled to the projectile device, at least one optical reference point is superposed within a first target area. The point of impact is created on a second target area using a projectile expelled from the projectile device towards the second target area. The point of aim for the projectile device is aligned with the point of impact while the position of the at least one optical reference point is maintained. Parallax is eliminated (or minimized) by aligning a primary and a secondary sight alignment indicator with each other and with a common optical axis extending through a scope configured to be coupled with the projectile device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UMAREX USA INC7700 CHAD COLLEY BLVD FORT SMITH AZ 72916

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hancosky, Jack Avoca, US 28 169

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00