Proportional pressure-regulating valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9733651
SERIAL NO

14891691

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A proportional pressure-regulating valve (10) for actuating a first fluid connection (f1) from a working connection (A) to a tank connection (T) and a second fluid connection (f2) from a supply connection (P) to the working connection (A), includes a regulating piston (14) guided movably in a valve housing (12). The regulating piston opens the first fluid connection (f1) and closes the second fluid connection (f2) when in a first position, and closes the first fluid connection (f1) and opens the second fluid connection (f2) when a second position. The regulating piston (14) can be displaced from a first position into a third position when the first fluid connection (f1) is open by the total differential pressure produced when fluid flows through. When the regulating piston (14) is in the third position, the first fluid connection (f1) is opened with an enlarged opening cross section compared to the first position, and the second fluid connection (f2) remains closed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYDAC FLUIDTECHNIK GMBH66280 SULZBACH/SAAR

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bruck, Peter Althornbach, DE 42 237
Grill, Martin St. Wendel, DE 35 666

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00