Apparatuses, methods, and systems for stochastic memory circuits using magnetic tunnel junctions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9734880
SERIAL NO

15088419

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments include apparatuses, systems, and methods including a memory apparatus including a plurality of bit cells, wherein each of the plurality of bit cells correspond to a respective weight value and include a switch device that has a magnetic tunnel junction (MTJ) or other suitable resistive memory element to produce stochastic switching. In embodiments, the switch device may produce a switching output according to a stochastic switching probability of the switch device. In embodiments, a bit line or a source line passes a current across the MTJ for a switching time associated with the stochastic switching probability to produce the switching output which enables a determination of whether the respective weight value is to be updated. Other embodiments may also be described and claimed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTEL CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Augustine, Charles Portland, US 48 457
Khellah, Muhammad M Tigard, US 113 1788
Paul, Somnath Hillsboro, US 54 428
Sheik, Sadique Ul Ameen San Diego, US 6 51

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00