Rechargeable battery and method to suppress dendrite

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9735412
SERIAL NO

14865109

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A battery cell includes a first current collector, a cathode in electrical contact with the first current collector, and a second current collector. The second current collector includes a metal foam having a porous structure, and an electrically insulating layer on outer surfaces of the porous structure facing the cathode. The electrically insulating layer isolates the outer surfaces facing the cathode from ions provided by the cathode. The electrically insulating layer is configured to allow an electrolyte to transport ions from the cathode to an inner portion of the porous structure of the metal foam. The battery cell may further include a separator to separate the cathode and the first current collector from the second current collector. When the battery cell is in at least a partially charged state, ions form an anode including a metal plating within the inner porous structure of the metal foam.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTEL CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Keates, Andrew W Los Gatos, US 16 92
Matsumura, Naoki San Jose, US 65 320

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00