Roadway renewable energy generation system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9735712
SERIAL NO

14776197

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A roadway renewable energy generation system and method, that includes a plurality of plunger devices, electrically connected in series, and each plunger device configured to generate a predetermined amount of electricity, through reciprocating linear motion, when actuated by an object; a plurality of grooves formed within a ground surface configured to house the plurality of plunger devices therein, wherein a top portion of each plunger device extends a predetermined distance above the ground surface; a transformer configured to transform the electricity generated by the plurality of plunger devices; and a storage device configured to store the electricity from the transformer. The system is embedded into roadways and parking garages/ramp entrances, for example, to enable electricity generated when each plunger device is depressed as the vehicle tires pass over the roadways to be stored and reused for electric vehicles and power/utility grids.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ERICKSON MICHAEL JHERNDON VA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Erickson, Michael J Herndon, US 14 163

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00