Micromechanical component having a diaphragm structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9738509
APP PUB NO 20150375991A1
SERIAL NO

14764259

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A diaphragm structure of a micromechanical component includes: a diaphragm integrated via at least one spring element into a layered structure, the diaphragm spanning a cavern, so that at least one section of the diaphragm edge extends up to and beyond the edge area of the cavern; and an anchoring structure formed in the overlap area between the diaphragm and the cavern edge area. The anchoring structure includes at least one anchor element structured out of the layered structure above the cavern edge area, and one through opening for the anchor element formed in the edge area of the diaphragm, so that there is a clearance between the anchor element and the through opening which allows for a mechanical stress relaxation of the diaphragm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ROBERT BOSCH GMBH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Schelling, Christoph Stuttgart, DE 108 777
Zoellin, Jochen Muellheim, DE 25 251

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00