Main bearing for crankshaft of internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9739303
SERIAL NO

15017993

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A main bearing includes first and second half bearings, each having a main cylinder portion and crush relief portions in both circumferential end portions. An oil groove circumferentially extends on an inner circumferential surface only of the first half bearing, one circumferential end portion of the oil groove opens on a circumferential end surface on a front side in a rotation direction, and the other circumferential end portion of the oil groove is positioned in the crush relief portion on a rear side in the rotation direction. The first half bearing includes a transition region between the crush relief portion on the front side in the rotation direction and the main cylinder portion, and the second half bearing includes a transition region between the crush relief portion on the rear side in the rotation direction and the main cylinder portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DAIDO METAL COMPANY LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kato, Kenta Inuyama, JP 33 142
Kawashima, Yuki Inuyama, JP 61 118

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00