Simultaneous economic dispatch and frequency regulation of power systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9742411
SERIAL NO

14873501

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Various examples are provided for feedback control of power systems. The feedback control can provide simultaneous frequency regulation and economic operation of a power system. In one example, a method includes obtaining a frequency difference associated with a generator of a power system; determining an output power adjustment based at least in part upon the frequency difference and a cost function associated with the generator; and providing a power command to a secondary frequency control of the generator, the power command based upon the output power adjustment. In another example, a generator control system includes a primary frequency controller configured to control frequency droop of a generator of a power system; and a secondary frequency controller configured to adjust output power of the generator based at least in part upon a frequency difference associated with the generator and a cost function associated with the generator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • UNIVERSITY OF SOUTH FLORIDA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fan, Lingling Tampa, US 15 15
Miao, Zhixin Tampa, US 16 154

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00