Inter-medium bridging with inter-domain routing and multi-medium domain coordination

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9742658
SERIAL NO

14881503

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Various embodiments of inter-medium bridging are described. In one aspect, a method may involve a plurality of inter-domain bridging devices transmitting a message that describes inter-domain routing capability of the inter-domain bridging devices to a respective domain master of each of a plurality domains to which the inter-domain bridging devices are connected. The method may also involve the plurality of domain masters exchanging messages that describe the inter-domain routing capability of the plurality of inter-domain bridging devices connected to the respective domain of each domain master. The method may further involve each domain master determining one of the domain masters to serve as a global domain master for calculating inter-domain routing paths.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • METANOIA COMMUNICATIONS INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brown, Terry Cris Austin, US 5 28
Chen, Kun-I Hsinchu, TW 3 15
Hsu, WuLung Hsinchu, TW 3 15
Mantri, Ravi Portland, US 9 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00