Multistage process for producing low-temperature resistant polypropylene compositions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9745397
APP PUB NO 20160194419A1
SERIAL NO

14786430

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for polymerizing propylene in the presence of a polymerization catalyst by copolymerizing propylene with a comonomer selected from the group of ethylene and C4-C10 alpha-olefins in three polymerization stages. The polymer produced in the first polymerization stage has the highest melt flow rate and the lowest content of comonomer. The polymer produced in the last polymerization stage has the lowest melt flow rate and the highest content of comonomer. The polymer composition produced by the process has good mechanical properties and can be used for making pipes. The process has a good productivity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOREALIS AGAUSTRIA VIENNA VIENNA VIENNA
ABU DHABI POLYMERS CO LTD (BOROUGE) L L CABU DHABI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alastalo, Kauno Porvoo, FI 41 402
Hedesiu, Cristian Abu Dhabi, AE 8 19
Leskinen, Pauli Helsinki, FI 137 525
Lilja, Johanna Kirkkokatu, FI 33 191

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00