Verifying source code in disparate source control systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9747098
SERIAL NO

15011285

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A computer program product for verifying source code in disparate source control systems. A processor configured to: obtain a first source code from a target repository; access a second source code from a source repository; and verify each file in the first source code matches each corresponding file in the second source code. Verifying causes the processor to: read contents of a file in the first source code in the target repository; access a corresponding file in the second source code in the source repository; replace contents of the corresponding file in the second source code in the source repository with the contents of the file in the first source code in the target repository; execute an editor in the source repository to display differences in the corresponding file that have been modified as a result of replacing contents; and log each file that does not match.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hayward, Schaefer Lauren J Newark, US 9 13
Terry, David G Nashua, US 7 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00