Single phase lead-free cubic pyrochlore bismuth zinc niobate-based dielectric materials and processes for manufacture

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9748019
SERIAL NO

15207653

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Both single phase lead-free cubic pyrochlore bismuth zinc niobate (BZN)-based dielectric materials with a chemical composition of Bi1.5Zn(0.5+y)Nb(1.5−x)Ta(x)O(6.5+y), with 0≦x<0.23 and 0≦y<0.9 and films with these average compositions with Bi2O3 particles in an amorphous matrix and a process of manufacture thereof. The crystalline BZNT-based dielectric material has a relative permittivity of at least 120, a maximum applied electric field of at least 4.0 MV/cm at 10 kHz, a maximum energy storage at 25° C. and 10 kHz of at least 50 J/cm3 and a maximum energy storage at 200° C. and 10 kHz of at least 22 J/cm3. The process is a wet chemical process that produces thin films of Bi1.5Zn(0.5+y)Nb(1.5−x)Ta(x)O(6.5+y) without the use of 2-methoxyethanol and pyridine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE PENN STATE RESEARCH FOUNDATION304 OLD MAIN UNIVERSITY PARK PA 16802

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Michael, Elizabeth K State College, US 2 0
Trolier-McKinstry, Susan State College, US 17 78

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00