Circuit device and method for the production thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9748213
APP PUB NO 20160240521A1
SERIAL NO

15027030

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A circuit device has a base plate, a first substrate arranged on a first outer side of the base plate, a second substrate arranged on a second outer side opposite the first outer side of the base plate, at least one electrical connection element that electrically connects the first substrate and the second substrate, at least one electronic component arranged on or in the first substrate, at least one electronic component arranged on or in the second substrate, a mold package molded around the two substrates and the electronic components arranged thereon, and at least one contacting element for electrically contacting the first substrate and/or the second substrate. The at least one contacting element is electrically conductively connected to the first substrate and/or the second substrate and is led out from the mold package.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CONTI TEMIC MICROELECTRONIC GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Schmidt, Thomas Burglengenfeld, DE 305 1584
Schuch, Bernhard Neusitz, DE 25 359
Steinau, Martin Nuremberg, DE 5 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00