Methods for overdriving a base current of an emitter switched bipolar junction transistor and corresponding circuits

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9748948
SERIAL NO

15394290

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An emitter switched bipolar transistor circuit includes a bipolar junction transistor (BJT) having a collector coupled to an output terminal, a metal oxide semiconductor field effect transistor (MOSFET) coupled to an emitter of the BJT, a bias voltage supply coupled to the base of the BJT, a buffer coupled to the base of the BJT, and a comparator. The comparator includes a first input coupled to the collector of the BJT, a second input coupled to a voltage reference, and an output coupled to an input of the buffer. The comparator is configured to receive a collector voltage of the BJT at the first input of the comparator, compare the received collector voltage with the voltage reference, and cause the buffer to inject a current pulse to the base of the BJT until the collector voltage is less than the voltage reference, indicating the BJT is substantially saturated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AES GLOBAL HOLDINGS PTE LTD9 RAFFLES PLACE #26-01 REPUBLIC PLAZA SINGAPORE 048619

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Phadke, Vijay Gangadhar Pasig, PH 27 636

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00