Balloon

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9751024
APP PUB NO 20160228784A1
SERIAL NO

14895627

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A balloon can maintain a bent state even if a bent state-holding member is not used. A balloon includes two plastic films that are stacked and sealed at a peripheral edge. The balloon includes a first part, a second part, and a bending part that is situated between the first part and the second part. The bending part includes a gas passage through which the interior of the first part and the interior of the second part communicate with each other, and a bending sealed part that is formed by sealing the two plastic films situated opposite to each other in an inward area relative to the peripheral edge. An outer edge of the bending sealed part extends beyond the bending part so as to be situated within the first part and the second part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAKARATEC CORP2-5 KAMATAHONCHO 1-CHOME OTA-KU TOKYO 144-0053

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Morita, Takemi Fujisawa, JP 3 12
Nakamura, Akira Yamato, JP 310 3171
Taniguchi, Satoru Yokohama, JP 45 528
Yoshida, Mitsunori Yokohama, JP 6 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00