Surfboard and method of manufacture

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9751598
SERIAL NO

15367573

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A surfboard includes a core covered with a laminate and having curved perforations in the deck area and the tail area of the surfboard, in order to prevent air blisters from forming between the core and laminate. The curved perforations are deformable under pressure to minimize the opening of the perforations to inhibit liquid from entering and maximizing under zero pressure to allow the maximum amount of trapped liquid and gasses from escaping. The core is formed from an extruded closed-cell polystyrene foam block that has been shaped by restraining it against a shaped form using shaped restraining tools and straps, and heating it; and by cutting using a hot wire. The core is laminated with FIBERGLAS® and epoxy resin, and the perforations are formed using a perforating tool that has a planar or curved working surface and one or more heated needles extending perpendicularly from the working surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YATES SHEY327 FIRESIDE STREET OCEANSIDE CA 92058

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huarcaya-Pro, Javier Carlsbad, US 5 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00