Catalytic reactor for converting contaminants in a displacement fluid and generating energy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9751767
APP PUB NO 20150093319A1
SERIAL NO

14505251

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method comprises receiving a carbon dioxide recycle stream having carbon dioxide and hydrocarbons. The carbon dioxide recycle stream is fed to a catalytic reactor. The hydrocarbons are converted to carbon dioxide in the catalytic reactor by a catalytic reaction without combustion to form a purified carbon dioxide recycle stream. Electrical energy is generated by using heat produced by the catalytic reactor in the conversion. Another method comprises receiving a recycle stream having carbon dioxide, C1-C2 hydrocarbons, and C3+ hydrocarbons. The C3+ hydrocarbons are separated from the carbon dioxide and the C1-C2 hydrocarbons. The carbon dioxide and the C1-C2 hydrocarbons are fed to a catalytic reactor at a pressure greater than about 300 pounds per square inch (psi), and the C1-C2 hydrocarbons are converted to carbon dioxide, water, and heat.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PILOT INTELLECTUAL PROPERTY LLC333 NORTH SAM HOUSTON PARKWAY EAST SUITE 600 HOUSTON TX 77060

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Prim, Eric The Woodlands, US 29 175

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00