Integrated process for treating recycled streams of PET and PTT

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9752005
SERIAL NO

15099700

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing a polyester polyol comprising reacting a recycle stream selected from recycled PET carpet, carpet fiber, containers, textiles, articles or mixtures thereof, with a glycol in a reactor, thereby forming a digested product stream comprising polyols, and an undigested stream; and then reacting the digested product stream with a hydrophobe selected from dimer fatty acids, trimer fatty acids, oleic acid, ricinoleic acid, tung oil, corn oil, canola oil, soybean oil, sunflower oil, bacterial oil, yeast oil, algae oil, castor oil, triglycerides or alkyl carboxylate esters having saturated or unsaturated C6-C36 fatty acid units, saturated or unsaturated C6-C36 fatty acids, alkoxylated castor oil, saturated or unsaturated C9-C18 dicarboxylic acids or diols, cardanol-based products, recycled cooking oil, branched or linear C6-C36 fatty alcohols, hydroxy-functional materials derived from epoxidized, ozonized, or hydroformylated fatty esters or acids, or mixtures thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RESINATE MATERIALS GROUP INCPLYMOUTH MI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bae, Woo-Sung Midland, US 23 106
Emerson, Adam W Ypsilanti, US 16 56
Mukerjee, Shakti L Canton, US 26 164
Phillips, Brian Douglas Wilson, US 7 11
Rogers, Kevin Farmington, US 19 96
Tabor, Rick Plymouth, US 44 167

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00