Process for controlling a power turbine throttle valve during a supercritical carbon dioxide rankine cycle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9752460
APP PUB NO 20140208751A1
SERIAL NO

14164780

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of the invention generally provide a heat engine system, a method for generating electricity, and an algorithm for controlling the heat engine system which are configured to efficiently transform thermal energy of a waste heat stream into electricity. In one embodiment, the heat engine system utilizes a working fluid (e.g., sc-CO2) within a working fluid circuit for absorbing the thermal energy that is transformed to mechanical energy by a turbine and electrical energy by a generator. The heat engine system further contains a control system operatively connected to the working fluid circuit and enabled to monitor and control parameters of the heat engine system by manipulating a power turbine throttle valve to adjust the flow of the working fluid. A control algorithm containing multiple system controllers may be utilized by the control system to adjust the power turbine throttle valve while maximizing efficiency of the heat engine system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ECHOGEN POWER SYSTEMS, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bowan, Brett A Copley, US 6 301

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00