Helical compression spring and method for manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9752636
APP PUB NO 20150252863A1
SERIAL NO

14427106

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The coil spring includes steel wire material containing 0.45 to 0.80 weight % of C, 0.15 to 2.50 weight % of Si, 0.3 to 1.0 weight % of Mn and iron and inevitable impurities as the remainder, and having a circle equivalent diameter of 2.5 mm to 10 mm, in which internal hardness at a freely selected cross section of the wire material is in a range of 570 to 700 Hv, C-condensed layer which exceeds average concentration of C contained in the steel wire material exists at surface layer part, and in an approximate maximum principal stress direction generated when a compressive load is loaded on spring of inner diameter side of the coil spring of the wire material, unloaded compressive residual stress at a depth of 0.2 mm and 0.4 min from surface of the wire material is not less than 200 MPa and not less than 60 MPa, respectively.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NHK SPRING CO LTDYOKOHAMA-SHI KANAGAWA 236-0004

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ono, Yoshiki Yokohama, JP 56 358
Ono, Yuitirou Fussa, JP 1 6
Shiraishi, Tohru Yokohama, JP 14 57
Takahashi, Keita Yokohama, JP 260 991

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00