Suspension system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9758210
SERIAL NO

14460800

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A compression assembly/system for a front suspension fork for a bicycle is disclosed. The compression assembly/system of the front suspension fork may comprise a combination of improved functional assemblies including a hydraulic bottom-out assembly/mechanism and a low-speed compression assembly/mechanism and a high-speed compression assembly/mechanism. The compression assembly/system of the front suspension fork may comprise an externally-adjustable hydraulic bottom-out mechanism; and substantially co-located external adjustment controls for bottom-out mechanism and low-speed compression mechanism and high-speed compression mechanism. The compression assembly/system may also comprise an axially-oriented (compression) mechanism configured to transmit movement/adjustment radially from inner components to outer components of the mechanisms to be adjusted.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HAYES BICYCLE GROUP INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kwaterski, Edward Charles Cedarburg, US 2 14
Pye, Nicholas William Carrboro, US 5 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00