Continuous manufacturing process for rubber masterbatch and rubber masterbatch prepared therefrom

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9758627
APP PUB NO 20160168341A1
SERIAL NO

14909936

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed are a continuous manufacturing process for a rubber masterbatch and a rubber masterbatch prepared therefrom. The manufacturing process comprises: 1): a filler is added to a rubber solution, forming a rubber/filler/solvent mixture by stirring; 2): the rubber/filler/solvent mixture obtained in step 1) is fed into a coagulator, and is coagulated after optionally being brought into contact and mixed with one or more fluids of nitrogen, steam, water, aqueous slurry of filler, and oil in the coagulator, resulting in a mixture of a rubber/filler composite and a solvent; 3): the mixture obtained in step 2) is directly passed into a heating medium at a temperature higher than the boiling point of the solvent, the polarity of the medium being different from that of the solvent used, the mixture is coagulated and deswelled, and the solvent is evaporated rapidly, thereby forming a mixture of a rubber/filler composite and the solvent containing the heating medium; and 4): the solvent is removed and the remaining mixture is dried, resulting in a rubber/filler masterbatch.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EVE RUBBER INSTITUTE CO LTD266000 NO 43 ZHENGZHOU ROAD SIFANG DISTRICT QINGDAO SHANDONG QINGDAO CITY SHANDONG PROVINCE 266000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dai, Deying Shandong, CN 5 24
Song, Jianjun Shandong, CN 11 36
Wang, Mengjiao Bedford, US 39 245

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00