Method and system for controlling water chemistry in power generation plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9758880
APP PUB NO 20110318223A1
SERIAL NO

13255765

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for controlling water chemistry in a power generation plant including a low-pressure feedwater heater (18), a deaerator (19), and a high-pressure feedwater heater (20) disposed sequentially along a feedwater pipe (16) from a condenser (15) to a steam generator or a boiler (11) to control the chemistry of feedwater guided to the steam generator or the boiler includes the steps of: injecting an oxidant through an oxidant injection line (31) into feedwater flowing through the feedwater pipe disposed downstream of the condenser in such a way that a dissolved oxygen concentration in the feedwater ranges from 3 to 100 ppb while the feedwater is maintained to be neutral to form an oxide film on surfaces of the feedwater pipe, the low-pressure feedwater heater, the deaerator, the high-pressure feedwater heater, and other structural members that come into contact with the feedwater; and injecting a deoxidant through a deoxidant injection line (35) into the feedwater flowing through the feedwater pipe disposed downstream of the deaerator in such a way that the dissolved oxygen concentration in the feedwater flowing into the steam generator or the boiler lowers to 5 ppb or lower.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA TOSHIBA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirasawa, Hajime Yokohama, JP 11 40
Miyazaki, Toyoaki Ota-ku, JP 5 5
Okamura, Masato Yokohama, JP 21 32
Shibasaki, Osamu Yokohama, JP 16 44

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00