Steel sheet for electroplating, electroplated steel sheet, and methods for producing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9758892
SERIAL NO

14391048

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A steel sheet for electroplating includes, by mass %, C: 0.0005% to 0.0050%, Si: 0.20% to 1.0%, Mn: 0.40% to 2.5%, P: 0.05% or less, Ti: 0.010% to 0.050%, Nb: 0.010% to 0.040%, B: 0.0005% to 0.0030%, S: 0.02% or less, Al: 0.01% to 0.30%, N: 0.0010% to 0.01%, and the balance including Fe and impurities, in which when Si content is represented by [Si] and Mn content is represented by [Mn], “[Mn]+5[Si]” is 2.0 to 7.0, and the steel sheet has surface property in which an average of displacements of a measurement point obtained based on a moving average of continuous 31 points in total including 15 front points and 15 back points in a cross-sectional profile of a surface obtained by measuring the average of displacements in an evaluation length of 10 μm or more at an interval of 0.07 μm, is 0.005 μm to 0.10 μm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATIONTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fuda, Masahiro Tokyo, JP 34 173
Kurosaki, Masao Tokyo, JP 33 316
Sato, Hironori Tokyo, JP 176 1246
Sugiura, Natsuko Tokyo, JP 35 390
Yamaguchi, Yuji Tokyo, JP 154 1195

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00