Metal material having protective coating and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9758894
APP PUB NO 20150218725A1
SERIAL NO

14613595

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a metal material is provided. The method includes steps of manufacturing a metal material in which oxygen atoms are dispersed, and forming a protective coating on a surface of the metal material by using an anode oxidation treatment, wherein the oxygen atoms in the metal material are supplied to the surface of the metal material during the anode oxidation treatment, so that the metal material and the protective coating are interface-bonded to each other substantially without pores therebetween or without an interface layer in which pores are formed, thereby improving corrosion resistance, as compared to a protective coating formed on a surface of a metal material in which oxygen atoms are not dispersed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INDUSTRY-ACADEMIC COOPERATION FOUNDATION YONSEI UNIVERSITY(YONSEI UNIVERSITY SINCHON-DONG) 50 YONSEI-RO SEODAEMUN-GU SEOUL 03722

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bae, Dong Hyun Seoul, KR 9 46
Kang, Hun Daejeon, KR 15 98

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00