Method for controlling a water sluice gate drive for a water sluice gate having an electric machine, service connection, water sluice gate drive and hydroelectric power plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9758940
APP PUB NO 20150330047A1
SERIAL NO

14654355

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for controlling a water sluice gate drive for a water sluice gate, in particular for a roller sluice gate, preferably in a hydroelectric power plant, wherein the drive has an electric machine, in particular has an asynchronous machine, in particular an asynchronous motor/generator. According to the invention, it is provided that the electric machine, in particular an asynchronous machine, has a fan brake, wherein the method comprises the steps of: disengagement of the fan brake in the case that an insufficient power supply is indicated, self-actuated operation of the electric machine, in particular an asynchronous machine, wherein the electric machine, in particular an asynchronous machine, is operated in generative island operation, in which a rotating field is generated in a self-actuating manner.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WOBBEN PROPERTIES GMBH26607 AURICH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Janssen, Andreas Dornum, DE 6 17
Uphoff, Heinrich Ihlow/Riepe, DE 3 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00