Torque-transmitting coupling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9759287
SERIAL NO

14817003

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A coupling for transmitting torque from a drive to a load has a first connection for connection with the drive, a second connection for connection with the load, and an elastic element for vibration damping and between the first and second connections in the energy transmission path therebetween. An actuator carried on the elastic element has a base body and a centrifugal mass body rotatable relative thereto. One of the two bodies carries an electrical conductor and the other of the two bodies carries a permanent magnet. The conductor is in a magnetic field of the permanent magnet. Thus a flow of current through the conductor makes the centrifugal mass body exert an angular force on the base body to compensate for rotational vibrations.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CENTA-ANTRIEBE KIRSCHEY GMBHBERGISCHE STR 7 HAAN D-42781

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bach, Martin Mettmann, DE 9 25
Exner, Jochen Hennef, DE 7 12
Fitsch, Martin Wuppertal, DE 3 1
Hartmann, Norbert Cologne, DE 5 46
Hasan, Mahamudul Bochum, DE 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00