Methods of producing dispersoid hardened metallic materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9764384
APP PUB NO 20160303653A1
SERIAL NO

14686313

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods of forming dispersoid hardened metallic materials are provided. In an exemplary embodiment, a method of producing dispersoid hardened metallic materials includes forming a starting composition with a base metal component and a dispersoid forming component. The starting composition includes the base metal component in an amount from about 50 to about 99.999 weight percent and the dispersoid forming component in an amount from about 0.001 to about 1 weight percent, based on the total weight of the starting composition. A starting powder is formed from the starting composition, and the starting powder is fluidized with a fluidizing gas for a period of time sufficient to oxidize the dispersoid forming component to form the dispersoid hardened metallic material. The dispersoid forming component is oxidized while the starting powder is a solid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HONEYWELL INTERNATIONAL INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mittendorf, Don Mesa, US 25 242
Tolpygo, Vladimir K Scottsdale, US 13 74

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00