Methods for protecting a ground surface from exposure to material that may be spilled from or leak from one or more containers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9764875
SERIAL NO

14856821

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods for protecting a ground surface from exposure to material that may be spilled from or leak from one or more containers, which includes setting up a portable spill containment system that includes at least one grate for supporting the one or more containers. The grate includes a plurality of drain holes. The portable spill containment system includes a flexible bag configured to contain spills or leakage from the one or more containers that pass through the drain holes of the grate. In one embodiment, the portable spill containment system includes a plurality of pedestals that support the at least one grate. In another embodiment, the portable spill containment system includes an interconnected grid structure formed of separate and distinct spaced apart beams.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ENPAC, L.L.C.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heintz, Robert Chardon, US 2 6
Janda, Scott Chagrin Falls, US 6 28
Reed, Timothy Northfield Center, US 12 55
Stanek, Lawrence Akron, US 6 13
Wiley, Jay Mentor, US 10 44

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00