Wind aeolipile

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9765755
SERIAL NO

14090280

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Described herein is essentially a high-efficiency, hybrid fluid-aeolipile. In operation, this hybrid device is placed in the stream of a moving fluid, preferably air. Energy is extracted from the fluid stream by directing a portion of the stream through and, optionally, around the device. As the fluid-flow moves through the device, it is directed into nozzles. These nozzles, which are free to pivot in a cyclical manner, employ the established phenomenon of “nozzle-effect” to accelerate the velocity of the air-flow passing through them, which is ultimately ejected from each nozzle tip, producing thrust. This thrust, amplified by nozzle-effect, drives the nozzles to pivot around a shared axis. The wind energy, thereby converted into cyclical motion, that may be used to perform useful work, is converted with greater efficiency, than is possible in conventional blade-type wind turbines.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gao, David Wenzhong Cookeville, US 4 4
Van, Neste Charles William Kingston, US 6 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00