Air conditioner controller, air conditioner control circuit and air conditioner control method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9766003
APP PUB NO 20150285529A1
SERIAL NO

14677831

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An air conditioner controller and a safety protection circuit for the same are provided. The air conditioner controller includes a central processing unit, a drive unit, a safety locking unit and a protection detection unit, where the central processing unit is configured to output an air conditioner control signal; the air conditioner motor drive unit is configured to receive a drive control signal output from the safety locking unit and the detection protection signal, and output a drive signal to control an operation of an air conditioner motor; the safety locking unit is configured to receive the detection protection signal and the air conditioner control signal, output the drive control signal, and control the air conditioner control signal to be transmitted or cut off based on the detection protection signal output from the protection detection unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HANGZHOU LEADERWAY ELECTRONICS CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Shanzeng Hangzhou, CN 1 0
Li, Shangen Hangzhou, CN 1 0
Run, Wenming Hangzhou, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00